Proud of our engineering and operation teams who managed to erect and commission, within 4 months, a ground-mounted 3,8 MWp solar plant on approximately 2 ha, directly connected to the INEOS Oligomers factory based in Feluy, Belgium.

The production of the solar plant will be fully and locally consumed helping Ineos save an estimated 800 tons of C02 annually.

Gregoire de Pierpont, CEO of ENERDEAL: “This project has been realized during harsh winter conditions and in respect of very strict safety rules. A great achievement and a nice reference for both Enerdeal and Ineos”.

DOWNLOAD WHITE PAPER

Unlock the Power of Solar Energy for Your Business

Expert engineering and construction
Optimal energy efficiency and maintenance
No upfront investment with Solar-As-a-Service

Illustrated Insights

No items found.
Related posts

Keep learning